We were instructed by the Contract Administrator, Core, to transform three floors at 6 New Bridge Street into modern office space though a CAT A refurbishment programme, delivered over a 12 week period.
The new spaces now offer a blank canvas with added value, including modern and practical features, designed to attract new occupiers.
We started with the strip-out works on all the three floors, managing to retain existing features such as the 3rd and 5th floor ceiling tiles and the floor slabs on the 2nd floor, which were professionally cleaned to give them a new lease of life. In addition to these works, the brief included:
The completed three-floor CAT A scheme was a straightforward project delivered in just 12 weeks. The refurbishment of the 2nd and 3rd floors created two blank canvas spaces with exposed M&E ceilings and polished floor slabs that also benefit from an abundance of natural light. The fifth floor had a soft fit-out that formed new small office/meeting rooms, a tea point installation and newly carpeted floor.