refurbishment of unit 4

The project began with a comprehensive strip out of all previous tenant installations to reinstate the warehouse and ancillary areas back to an open-plan CAT A condition.

Roofing works improved weather performance and safety, while façade cleaning and repairs refreshed the overall appearance of the property. Externally, the scheme focused on sustainability and user experience with new EV charging provision, cycle facilities, and upgraded hard landscaping.

Key works undertaken:

  • CAT A Strip Out & Internal Refurbishment
    Removal of all previous tenant installations, reinstatement of open-plan warehouse space, refurbishment of office areas, upgraded finishes, ceilings, and WC facilities.
  • Roofing Improvements
    Overcoating existing roof coverings, replacement of rooflights, gutter relining, corrosion treatment, and installation of a man-safe system for future maintenance and PV access.
  • Façade, Doors & Windows
    Brickwork cleaning and repairs, replacement of damaged cladding elements, servicing of windows, fire exits, roller shutter doors, and renewal of defective seals and ironmongery.
  • Redecoration Works
    Full preparation and redecoration of doors, frames, cladding, and metalwork across all elevations.
  • External Works & Sustainability Enhancements
    Kerb replacements, jet washing of paved areas, installation of EV charging bays, new bike racks, and hard landscaping improvements.

The new space

By combining structural upgrades with aesthetic improvements and sustainability features, the project delivered a high-quality, flexible asset ready for occupation.

The works enhanced the property’s potential value, positioning it competitively within the industrial and logistics market, for our client Tritax.

Whatever you need a space to do, we make it happen. Talk to us about how we can create a space that works for you.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.